3
min read
Active construction of DESIRE Antalya continues! We share news from the construction site:
Block A1
Columns, pylons, and elevator shafts of the 3rd floor have been concreted. Work continues on installing the formwork for the 3rd-floor slab.
Block A2-1
Columns, pylons, elevator shafts, stairs, and the 2nd-floor slab have been concreted.
Block A2-2:
All monolithic structures of the 2nd floor have been completed. Columns and elevator shafts of the 3rd floor have been concreted.
Block A3:
All monolithic structures of the 2nd floor have been concreted. Work continues on reinforcing and installing formwork for columns, elevator shafts, and the staircase of the 3rd floor.